Fire Door Gap Remedial Works in Wembley, London
CFP Carpentry & Fire Prevention recently completed fire door remedial works in Wembley, London, after several existing flat entrance doors were found to have excessive gaps around the door leaves. The customer asked us to reduce the gaps and improve the existing door sets rather than immediately replacing them. Our team carefully adjusted the frames […]
11 Flat Entrance Fire Doors Remediated Following Failed FRA in Peckham
CFP Carpentry & Fire Prevention recently completed a programme of fire door remedial works to 11 flat entrance doors at a residential property in Peckham, London, following defects identified during a Fire Risk Assessment. The project involved correcting excessive door gaps, adjusting existing door frames and ensuring the self-closing devices operated correctly across the affected […]
FD60(S) Fire Door Set Replacements Following Water Damage at Deloitte, Central London
CFP Carpentry & Fire Prevention recently completed a programme of FD60(S) fire door set replacements at Deloitte in Central London, following water damage within the basement of the building. A leak in the basement had caused significant damage to the lower sections of a number of the existing fire door sets, with moisture damage extending […]
Fire Door Remedial Works at 8 Finsbury Circus
CFP Carpentry & Fire Prevention recently completed a large package of fire door remedial works at 8 Finsbury Circus, London, involving 138 FD60 door sets. The doors were approximately 2.5 metres in height, requiring careful adjustment and remedial work to help bring the gaps and seals in line with the required standard. Closing Fire Door […]
FD30 Double Door Set Replacement at the National Audit Office
CFP Carpentry & Fire Prevention recently completed fire door replacement works at the National Audit Office, London, replacing 3 double door sets that had reached the end of their serviceable life. The existing doors had become worn due to age and were no longer suitable for the standard required. Our team removed the old door […]
Door Adjustment at Dominique London
Commercial Door Adjustment in Central London A recent visit was carried out at Dominique London, 26 St James’s Square, to complete a slight adjustment to the entrance door. The issue was straightforward but important — the door was not closing correctly. Over time, even small alignment problems can stop a door from sitting properly in […]
Fire Door Survey at The Helicon, Central London
We recently carried out a full fire door survey at The Helicon in Central London, inspecting 413 doors throughout the building. The Helicon is located on the corner of South Place and Finsbury Pavement, close to Moorgate, making it a prominent commercial building in the City of London. Each door was assessed for key compliance […]
National Audit Office – Bespoke FD30 & FD30(S) Fire Door Installation
Project Overview – Fire Door Compliance for a Government Building We were instructed to carry out a large-scale bespoke fire door installation project at the National Audit Office, delivering 40 bespoke single and double fire door sets as part of ongoing fire safety and building compliance works. Due to the nature of the existing structure, […]
Fire Door Inspection at Chelsea FC Academy – Compliance Checks Across Training & Communal Areas
Project Overview – Fire Door Inspection for a Professional Football Academy This project involved a detailed fire door inspection at the Chelsea FC Academy, focusing on ensuring that all internal and communal fire doors met current UK fire safety regulations. Due to the high daily occupancy of players, staff, and visitors, maintaining compliant fire doors […]
Fire Door Survey at 8 Finsbury Circus, London – 140 Communal Fire Doors Inspected for Compliance
Project Overview – Large-Scale Fire Door Survey in a Commercial Building This project involved a comprehensive fire door survey at 8 Finsbury Circus, a prominent commercial property in central London. The purpose of the survey was to assess the condition, performance, and compliance of all communal fire doors throughout the building and to confirm alignment […]